2 units of AS6015 flat-top tower crane, 2 units of SC200/200BD construction hoists (rated lifting capacity: 2×2000kg, rated speed: 0-40m/min)
Environment & Operational ChallengesThe industrial plant construction site is located in a high-density area with strict construction standards. This project demands extremely high precision for the installation of steel structures and large precase components. The cranes need to work efficiently while the construction hoists are required to transport materials to multiple elevated work zones.
Solution Provided2 flat-top tower cranes were deployed to ensure the stable lifting and precise positioning of large components, playing a key role in heavy loads lifting and covering specific areas. Multiple heavy-duty construction hoists were used to work with the tower cranes, forming a comprehensive transport network covering the entire contruction site.
Client & General Contractor FeedbackThis solution is not only stable but also fast and precise. It met our dual requirements for accuracy and efficiency, ensuring the construction project was timely completed.